DT22S Three Phase 2.2kW Single Channel Sewage Pump – Davey $2080.00 incl GST

DT22S Three Phase 2.2kW Single Channel Sewage Pump – Davey $2080.00 incl GST

In stock

Davey DT22S Three Phase 2.2kW, Single Channel Wastewater Pump
Capable of pumping soft solids in suspension up to 900 lpm

Pump performance: 300 lpm @ 16 metres
Pump performance: 600 lpm @ 10 metres
Pump performance: 900 lpm @ 4 metres
Electrical: 400/3/50 FLC 4.5 amps SC 31.5 amps
Cable: 10 metres in length 3C + E HO7RNF
Passage through pump: 10mm soft solids
Outlet connection:  80mm FI BSP
Manufacturer’s warranty:  2 years

SKU: DT22S

Description

Davey DT22S Three Phase 2.2kW, Single Channel Wastewater Pump
Davey sewage and waste water pumps are less susceptible to blockage
Capable of pumping soft solids in suspension up to 900 lpm
Suitable for applications such as moving rainwater, storm water and sewage

Pump performance:  Shut off head 21 metres
Pump performance: 300 lpm @ 16 metres
Pump performance: 600 lpm @ 10 metres
Pump performance: 900 lpm @ 4 metres

Electrical: 400/3/50 FLC 4.5 amps SC 31.5 amps
Cable: 10 metres in length 3C + E HO7RNF
Passage through pump: 10mm soft solids
Method of starting: DOL or soft starter
Outlet connection:  80mm FI BSP
Maximum liquid temperature: 40 deg C

Manufacturer’s warranty:  2 years

 

Additional information

Weight50 kg
Dimensions60 × 50 × 40 cm

Davey DT22S Data Sheet

Download