• August 6, 2019

Contruction Site Dewatering

Three dewatering pumps were installed to overcome a rain event which would flood the construction site. The dewatering pumps will stay in place to prevent any future flooding.

  • July 6, 2019

South East Queensland

Water supply VFD Booster pumps, built in our workshop to increase low water pressure in mains. SMS controlled and monitored system designed and installed by Pumps and Pipes.

  • June 6, 2019

Brisbane CBD

We recently installed 2 x 11kw storm water pumps, soft starters with multi-trode level sensor in underground car park. Duty 30lps for each pump. The customer complained about water hammer and constant rattling of pipes. We designed and installed a pump station to suit.

  • February 6, 2019

  • January 6, 2019

Gold Coast Project

Recently installed and commissioned rainwater change over system in apartments on Gold Coast. 2 x 2.2kw VFD pump supplying water for toilets and irrigation system around apartments.